  1. Revision of technical documentation of the Brod oil refinery 
  2. Revision of the construction design of the municipality building, phase by phase, the municipality of Visegrad
  3. Revision of the main design of “South ring road” in Gacko, phase 4, the municipality of Gacko
  4. Revision of technical documentation of the main design for construction of a business facility (construction of auto-basis) in Kumsale in Banja Luka
  5. Revision of design-technical documentation of the main design of the facility – power transmission line 20/35 Kv from the facility MXE PC 2 to switchgear substation 35/20/10 “Kopaci” in the municipality of Rudo, Novo Gorazde and Rogatica
  6. Technical control of the main design of the substation 400/110/35/10 kV “Stanari” and ovehead lines 400 kV and 110 kV
  7. Revision of technical documentation of the detailed design of the construction of a residential-business facility in Slobodana Kusturica street in Banja Luka
  8. Revision of the reconstruction design and expansion of the water main system Kotor Varos: design of renovation Bijelo Polje
  9. Revision of the main design of the reconstruction of the road bridge on the Jakotina river in the settlement Kotor, Bobas, the municipality of Kotor Varos
  10. Revision of the design of the construction of the power transmission line 10(20) kV and 10(20)/0.4kV; 400kVA “the source of Pliva” – the municipality of Sipovo 
  11. Revision of the main design of the diesel station with a warehouse in the “Bogutovo village” in Ugljevik