- Revision of technical documentation of the Brod oil refinery
- Revision of the construction design of the municipality building, phase by phase, the municipality of Visegrad
- Revision of the main design of “South ring road” in Gacko, phase 4, the municipality of Gacko
- Revision of technical documentation of the main design for construction of a business facility (construction of auto-basis) in Kumsale in Banja Luka
- Revision of design-technical documentation of the main design of the facility – power transmission line 20/35 Kv from the facility MXE PC 2 to switchgear substation 35/20/10 “Kopaci” in the municipality of Rudo, Novo Gorazde and Rogatica
- Technical control of the main design of the substation 400/110/35/10 kV “Stanari” and ovehead lines 400 kV and 110 kV
- Revision of technical documentation of the detailed design of the construction of a residential-business facility in Slobodana Kusturica street in Banja Luka
- Revision of the reconstruction design and expansion of the water main system Kotor Varos: design of renovation Bijelo Polje
- Revision of the main design of the reconstruction of the road bridge on the Jakotina river in the settlement Kotor, Bobas, the municipality of Kotor Varos
- Revision of the design of the construction of the power transmission line 10(20) kV and 10(20)/0.4kV; 400kVA “the source of Pliva” – the municipality of Sipovo
- Revision of the main design of the diesel station with a warehouse in the “Bogutovo village” in Ugljevik